London Borough of Hounslow
Brownfield land
There is a problem
- PlanningHistory column must have valid URIs
HOLP17
- SiteReference
- HOLP17
- SiteNameAddress
- Land to the South Side of, Brentford High Street,Brentford,TW8 8EW
- GeoX
- POINT(-0.307198 51.482758)
- GeoY
- POINT(-0.307198 51.482758)
- SiteplanURL
- https://london-borough-of-hounslow.portaljs.com/london-borough-of-hounslow/brownfield_land/r/2ee1a2f8-ff83-42ab-9cea-0afd1d91fd78
- Hectares
- 5.02
- OwnershipStatus
- not-owned-by-a-public-authority
- PlanningStatus
- permissioned
- PermissionType
- outline-planning-permission
- PermissionDate
- 2015-04-02
- PlanningHistory
- Deliverable
- yes
- NetDwellingsRangeFrom
- 518
- NetDwellingsRangeTo
- 518
- HazardousSubstances
- Notes
- An outline planning application for the demolition of existing buildings and retention of a number of buildings as part of a comprehensive mixed use development comprising a maximum of 111,821sqm (GEA) including a maximum of 876 residential units along with associated works. The proposed development includes retail (A1 use), residential (C3 use), business (B1 use) and leisure (D1/D2 use) and associated uses as part of the development including car parking, cycle storage, and an energy centre. Creation of enhanced vehicular access and public realm works including hard and soft landscaping, works to the river walls and facilities associated with the mooring of boats, boat storage and maintenance. Full details are submitted for Phase 1 which includes erection of 323 residential units (C3 use), retail (A1 use) and commercial units (B1 use), an energy centre, car and cycle parking and associated works with creation of new vehicular and pedestrian access and circulation. Works to 129-130 High Street, works to and within Workhouse Dock including the provision of mooring facilities, a new pontoon access and associated facilities and other works incidental to the proposals (including Environmental Impact Assessment)(As amended)
- FirstAddedDate
- 2017-12-31
- LastUpdatedDate
- 2024-12-20
- EndDate
How to fix this issue
Your data is missing a PlanningHistory.
The Brownfield land guidance explains how to fix the issue:
PlanningHistory
How to improve London Borough of Hounslow’s data
- Fix the errors indicated
- Use the check service to make sure the data meets the standard
- Publish the updated data on the endpoint URL